Subscribe: one ben bir sey
http://onebenbirsey.blogspot.com/feeds/posts/default
Added By: Feedage Forager Feedage Grade B rated
Language: English
Tags:
back  beg  bind  end  front  hdc  knit  loop  needle  rep  row  rows  stitch  sts  times  work  – sts     
Rate this Feed
Rate this feedRate this feedRate this feedRate this feedRate this feed
Rate this feed 1 starRate this feed 2 starRate this feed 3 starRate this feed 4 starRate this feed 5 star

Comments (0)

Feed Details and Statistics Feed Statistics
Preview: one ben bir sey

one ben bir sey





Updated: 2018-02-14T14:14:03.186+03:00

 



Loop Edge Fringe

2018-01-25T20:58:38.498+03:00







0 Comments

2018-01-18T22:37:36.318+03:00

Knit and Crochet beg: beginningCC: contrasting colorcn: cable needlecont: continuedec: decreasedpn: double pointed needlesest: establishedinc: increaseK: knitKSP: Knit 1, then slip stitch back to left hand needle, lift 2nd stitch on left hand needle back over returned stitch and replace returned stitch on RH needle (1 stitch decreased).K2SP: Knit 2 together, then slip stitch back to left hand needle, lift second stitch on left hand needle back over returned stitch and replace returned stitch on right hand needle (2 stitches decreased).LH: left handlp(s): loop(s)LT2 (Left Twist): Skip 1 stitch, knit second stitch through back loop, then knit both stitches together through back loopMC: main colorM1k: Pick up horizontal strand between stitch just worked and next stitch, place on left hand needle, knit this stitch (1 stitch increased).M1p: Pick up horizontal strand between stitch just worked and next stitch, place on left hand needle, purl this stitch (1 stitch increased).p: purlpat(s): pattern(s)pm: place markerpsso: pass slip stitch over knit stitchp2sso: pass 2 slip stitches over knit stitchrem: remainingrep: repeatRH: right handrnd(s): round(s)RS: right sideRT2 (Right Twist): Knit 2 stitches together, leaving them on the left hand needle, then knit the first stitch again slipping both stitches to the right hand needle.SKP: slip 1, knit 1, pass slip stitch oversl: slipSSK: Slip 2 stitches knitwise, insert point of left hand needle through fronts of these 2 stitches and knit 2 together.st(s): stitch(es)TBL: through back loop(s)tog: togetherWS: wrong sidewyib: with yarn in backwyif: with yarn in frontyo: yarn overend on WS: end having just completed a Wrong Side row.end on RS: end having just completed a Right Side rowSTOCKINETTE ST (St st): Knit 1 row, purl 1 row alternately when working on straight needles. The knit side is the right side of work. Knit EVERY round when working in the round on a circular needle.Reverse St st (Rev St st): Purl 1 row, knit 1 row alternately when working on straight needles. The purl side is the right side of the work. Purl EVERY round when working in the round on a circular needle.GARTER ST: Knit EVERY row when working on straight needles. Knit 1 round, purl 1 round when working on a circular needle.Crochetbphdc (back post half double crochet): Yarn over, insert hook from back to front to back around post of half double crochet one row below, yarn over, draw up a loop, yarn over, draw through all 3 loops on hook (this is worked on even # or wrong side rows)bptr (back post triple): Yarn over twice, inserthook from back to front around post of stitch on previous row and pull up a loop, (yarn over and draw through 2 loops on hook) 3 times.ch: chaindc: double crochetfphdc (front post half double crochet):Yarn over, insert hook from front to back to front around post of half double crochet one row below, yarn over, draw up a loop, yarn over, draw through all 3 loops on hook (this is worked on odd # or right side rows)fptr (front post triple): Yarn over twice, insert hook from front to back around post of stitch on previous row and pull up a loop, (yarn over and draw through 2 loops on hook) 3 times.hdc: half double crochethdctbl: Half double crochet worked in the back loophdctfl: Half double crochet worked in the front loopsl st: slip stitchsp: spacetr: treble[...]



I love cats

2018-01-18T22:23:18.680+03:00




kamyon bumperleri

2017-04-15T12:11:52.771+03:00

ALIRIM ANAHTARINI RAHMETLİ BABAN DA SOLLARDI YAŞAMAK BUYSA ÜSTÜ KALSIN OTOBÜSÇÜ DEĞİLİZKİ HOSTESİMİZ OLSUN TAKSİCİ DEĞİLİZ Kİ MANİTAMIZ OLSUN BİZDE SEBZECİYİZ ARKADAŞ YOLUMUZ AÇIK OLSUN KLİBİMDE OYNARMISIN :) [...]



NOSTALJİK REKLAMLAR 3

2016-12-04T19:10:07.226+03:00

[...]



NOSTALJİK REKLAMLAR 2

2016-11-25T13:36:22.812+03:00

[...]




2016-08-29T22:37:17.257+03:00

Hello August



HELLO APRIL

2016-04-02T13:37:32.833+03:00




DARLING PINCUSHION

2014-03-29T19:36:48.455+02:00

Harika veee çokkk cici bir iğnedenlik
Darling baby shoe pincushion Courtesy of sweet vintage rose cottage





SPRING SPECIAL :)

2014-03-28T21:01:07.725+02:00

(image)

(image)
Cook cici bir çanta
A very cute bag




Rosina

2012-02-19T20:03:00.731+02:00

Knit and Crochet beg: beginningCC: contrasting colorcn: cable needlecont: continuedec: decreasedpn: double pointed needlesest: establishedinc: increaseK: knitKSP: Knit 1, then slip stitch back to left hand needle, lift 2nd stitch on left hand needle back over returned stitch and replace returned stitch on RH needle (1 stitch decreased).K2SP: Knit 2 together, then slip stitch back to left hand needle, lift second stitch on left hand needle back over returned stitch and replace returned stitch on right hand needle (2 stitches decreased).LH: left handlp(s): loop(s)LT2 (Left Twist): Skip 1 stitch, knit second stitch through back loop, then knit both stitches together through back loopMC: main colorM1k: Pick up horizontal strand between stitch just worked and next stitch, place on left hand needle, knit this stitch (1 stitch increased).M1p: Pick up horizontal strand between stitch just worked and next stitch, place on left hand needle, purl this stitch (1 stitch increased).p: purlpat(s): pattern(s)pm: place markerpsso: pass slip stitch over knit stitchp2sso: pass 2 slip stitches over knit stitchrem: remainingrep: repeatRH: right handrnd(s): round(s)RS: right sideRT2 (Right Twist): Knit 2 stitches together, leaving them on the left hand needle, then knit the first stitch again slipping both stitches to the right hand needle.SKP: slip 1, knit 1, pass slip stitch oversl: slipSSK: Slip 2 stitches knitwise, insert point of left hand needle through fronts of these 2 stitches and knit 2 together.st(s): stitch(es)TBL: through back loop(s)tog: togetherWS: wrong sidewyib: with yarn in backwyif: with yarn in frontyo: yarn overend on WS: end having just completed a Wrong Side row.end on RS: end having just completed a Right Side rowSTOCKINETTE ST (St st): Knit 1 row, purl 1 row alternately when working on straight needles. The knit side is the right side of work. Knit EVERY round when working in the round on a circular needle.Reverse St st (Rev St st): Purl 1 row, knit 1 row alternately when working on straight needles. The purl side is the right side of the work. Purl EVERY round when working in the round on a circular needle.GARTER ST: Knit EVERY row when working on straight needles. Knit 1 round, purl 1 round when working on a circular needle.Crochetbphdc (back post half double crochet): Yarn over, insert hook from back to front to back around post of half double crochet one row below, yarn over, draw up a loop, yarn over, draw through all 3 loops on hook (this is worked on even # or wrong side rows)bptr (back post triple): Yarn over twice, inserthook from back to front around post of stitch on previous row and pull up a loop, (yarn over and draw through 2 loops on hook) 3 times.ch: chaindc: double crochetfphdc (front post half double crochet):Yarn over, insert hook from front to back to front around post of half double crochet one row below, yarn over, draw up a loop, yarn over, draw through all 3 loops on hook (this is worked on odd # or right side rows)fptr (front post triple): Yarn over twice, insert hook from front to back around post of stitch on previous row and pull up a loop, (yarn over and draw through 2 loops on hook) 3 times.hdc: half double crochethdctbl: Half double crochet worked in the back loophdctfl: Half double crochet worked in the front loopsl st: slip stitchsp: spacetr: trebleGAUGE: In order to ensure correct finished measurements, accurate stitch and row gauges must be achieved.TO CHECK GAUGE: Cast on at least 20 stitches, using the yarn and needles specified in the instructions. Work pattern for 3". Bind off all stitches. Using a ruler as a guide, count the number of stitches and rows over 2". (Do not include selvage stitches or cast on and bind off rows) Divide by 2. If this number is MORE than given in the instruc[...]



Claudja

2011-04-08T14:32:05.681+03:00

Keep your style high (even on bad hair days) with Claudja, an easy kerchief with a beaded hem. One size FINISHED MEASUREMENTS Approximately 19” across (not including ties) x 10” long MATERIALS 1 Ball each BERROCO GLINT (50 grs), #2945 Phoenix Orange (MC) and #2930 Argonaut (CC) 24” Length circular knitting needle, size 8 (5.00 mm) OR SIZE TO OBTAIN GAUGE Safety pin for marker Tapestry needle 32 Wooden beads to fit over tapestry needle GAUGE 20 sts = 4”; 26 rows = 4” in St st TO SAVE TIME, TAKE TIME TO CHECK GAUGE NOTE Center st is marked with safety pin. Make sure to move the pin up as each row is worked, always marking center st. STITCH GLOSSARY Center Dec Sl 2 sts knitwise, dropping marker, k1, psso, mark resulting st KERCHIEF Thread end of CC into tapestry needle, then thread all beads onto yarn. With circular needle, using CC, cast on 123 sts. Row 1 (WS): K1, * slip bead into place, k4, * rep between *’s 14 times more, sl bead into place, k1, mark st just worked with pin, sl bead into place, k4, rep between *’s 14 times more, sl bead into place, k1 – 32 beads have been placed. Change to MC and turn. Row 2 (RS): K to 1 st before marked st, work center dec, k to end – 121 sts. DO NOT turn. Sl sts to beg of needle to be worked from RS again. Row 3 (RS): With CC, knit, moving pin marker up to center st. Turn. Row 4 (WS): With MC, rep Row 2 – 119 sts. DO NOT turn. Sl sts to beg of needle to be worked from WS again. Row 5 (WS): With CC, rep Row 3. Turn. Row 6 (RS): With MC, rep Row 2 – 117 sts. DO NOT turn. Sl sts to beg of needle to be worked from RS again. Row 7 (RS): With CC, rep Row 3. Turn. Row 8 (WS): With MC, rep Row 2 – 115 sts. DO NOT turn. Sl sts to beg of needle to be worked from WS again. Row 9 (WS): With CC, rep Row 3. Turn. Row 10 (RS): With MC, rep Row 2 – 113 sts. DO NOT turn. Sl sts to beg of needle to be worked from RS again. Row 11 (RS): With CC, rep Row 3. Turn. Row 12 (WS): With MC, rep Row 2 – 111 sts. DO NOT turn. Sl sts to beg of needle to be worked from RS again. Row 13 (WS): With CC, rep Row 3. Turn. Fasten off CC and work from here with MC only. Next Row (RS): K to 1 st before marked st, work center dec, k to end – 109 sts. Purl 1 row. Rep the last 2 rows twice more, end on WS – 105 sts. Dec Row 1 (RS): K2, SSK, k to 1 st before marked st, work center dec, k to last 4 sts, end k2 tog, k2 – 101 sts. Purl 1 row. Rep these 2 rows twice more, end on WS – 93 sts. Dec Row 2 (RS): K2, sl 1, k2 tog, psso, k to 1 st before marked st, work center dec, k to last 5 sts, end k3 tog, k2 – 87 sts. Purl 1 row. Rep these 2 rows 14 times more, end on WS – 3 sts. K3 tog. Fasten off. FINISHING Band and Ties: With circular needle, using MC, cast on 140 sts. Knit 5 rows. Bind off loosely knitwise. Sew cast-on edge of band to side edges of kerchief, leaving 4” free at each side for ties. Optional: With circular needle, using MC, cast on 20 sts, using long-tail method (make sure you have a really long tail to work with); with RS facing, * pick up 1 st in side edge of kerchief with working strand, then pick up 1 st with long tail, rep from * until you have picked up 100 sts along side edge of kerchief; cast on 20 sts more – 140 sts. Knit 5 rows, end on WS. Bind off loosely knitwise. [...]



Alain

2011-04-01T16:55:50.560+03:00

Geek chic at its best, this feminine vest is finished with a flirty crochet edge. Shown in size Small SIZES Directions are for women’s size X-Small. Changes for sizes Small, Medium, Large, 1X and 2X are in parentheses FINISHED MEASUREMENTS Bust (closed) – 32(36-40-44-48-52)” Length – 17½(18-19-19½-20½-20½)” MATERIALS 2(2-3-3-3-3) Balls BERROCO VINTAGE DK (100 grs), #2184 Sloe Berry (MC) and 1 ball #2105 Oats (CC) Straight knitting needles, size 5 (3.75 mm) OR SIZE TO OBTAIN GAUGE Crochet hook, size 3.75 mm (F-5) Two 1” buttons Optional: 1 metal snap GAUGE 23 sts = 4”; 32 rows = 4” in St st TO SAVE TIME, TAKE TIME TO CHECK GAUGE BACK With straight needles, using MC, cast on 80(92-104-114-126-138) sts. Work even in St st for 1(1-1½-1½-2-2)”, end on WS. Inc Row (RS): K1, M1k, k to last st, M1k, k1 – 82(94-106-116-128-140) sts. Rep this inc every 1” 5 times more – 92(104-116-126-138-150) sts. Work even until piece measures 8(8-8½-8½-9-9)” from beg, end on WS. Shape Armholes: Bind off 5(5-6-7-9-10) sts at beg of the next 2 rows, then 2 sts at beg of the following 2 rows – 78(90-100-108-116-126) sts. Dec Row (RS): K1, SSK, k to last 3 sts, k2 tog, k1 – 76(88-98-106-114-124) sts. Rep this dec every RS row 3(9-12-13-14-16) times more – 70(70-74-80-86-92) sts. Work even until armholes measure 8½(9-9½-10-10½-10½)”, end on WS. Shape Shoulders: Bind off 5(5-5-5-7-8) sts at beg of the next 4(4-8-2-4-2) rows, then 4(4-0-6-6-7) sts at beg of the next 4(4-0-6-4-6) rows. Bind off remaining 34 sts for back neck. LEFT FRONT With straight needles, using MC, cast on 40(46-52-57-63-69) sts. Row 1 (RS): K to last st, pick up horizontal strand between the st just worked and next st and place this strand on RH needle, sl the last st. Row 2: P slipped st and picked-up strand tog TBL, p to end. Work even in pat as established until piece measures ½” from beg, end on WS. Buttonhole Row (RS): K to last 12 sts, bind off 2 sts, k to last 5 sts, bind off 2 sts, work to end. Next Row: Work in pat as established, cast on 2 sts over each pair of sts bound off on previous row. Work even until piece measures 1(1-1½-1½-2-2)” from beg, end on WS. Shape Side and Neck: Next Row (RS): K1, M1k (side inc), k to last 3 sts, k2 tog (neck dec), work last 2 sts in pat as established. Working incs and decs in this manner, continue to inc at side edge every ¾” 5 times more. AT THE SAME TIME, continue to dec at neck edge every 1” 16 times more. When side incs have been completed and piece measures 8(8-8½-8½- 9-9)” from beg, end on WS. Continuing to work neck decs, shape armhole same as back, working decs as k1, SSK. When all armhole and neck decs have been completed, work even on 18(18-20-23-26-29) sts until armhole measures 8½(9-9½-10-10½-10½)”, end on WS. Bind off 5(5-5-5-7-8) sts at armhole edge 2(2-4-1-2-1) times, then 4(4-0-6-6-7) sts 2(2-0-3-2-3) times for shoulder. RIGHT FRONT With straight needles, using MC, cast on 40(46-52-57-63-69) sts. Knit 1 row, end on RS. Row 1 (WS): P to last st, pick up horizontal strand between last st worked and next st and place this strand on RH needle, sl 1. Row 2 (RS): K2 tog TBL, k to end. Working in pat as established, complete to correspond to left front, reversing all shaping and omitting buttonholes. Work neck decs at beg of RS rows as work 2 sts in pat as established, SSK. Work side incs at end of[...]



Anupriya

2010-12-10T15:28:33.647+02:00

Skill level: Easy Shown in child’s and women’s sizes FINISHED MEASUREMENTS Child’s hat: Approximately 17” around x 5” high (not including earflaps) Women’s hat: Approximately 21: around x 7” high (not including earflaps) MATERIALS 1 ball BERROCO SOX (100 grs), #1424 Huddersfield for child’s hat and 1 ball #1452 Bonham for women’s hat Crochet hook, size 3.75 (F-5) OR SIZE TO OBTAIN GAUGE GAUGE 20 hdc’s = 4”; 16 rnds = 4” in pat st TO SAVE TIME, TAKE TIME TO CHECK GAUGE STITCH GLOSSARY Popcorn Work 5 dc’s in next st; drop loop from hook; insert hook in top of first dc from front to back; return loop to hook; pull loop through dc, ch 1 (this ch-1 is the top of the popcorn) CHILD’S HAT With crochet hook, using Huddersfield, ch 2. Rnd 1: Work 10 hdc’s in 2nd ch from hook, join with a sl st in top of first hdc – 10 sts. DO NOT turn. Work from here in the round. Rnd 2: Ch 1, * 2 hdc in next st, rep from * around, join with a sl st in top of first hdc – 20 sts. Rnd 3: Ch 1, * 2 hdc in next st, popcorn in next st, rep from * around, join with a sl st in top of first hdc – 30 sts. Rnd 4: * Hdc in each of the next 2 sts, 2 hdc in next st, rep from * around, join with a sl st in top of first hdc – 40 sts. Rnd 5: Ch 1, * 2 hdc’s in next st, hdc in each of the next 2 sts, popcorn in next st, rep from * around, join with a sl st in top of first hdc – 50 sts. Rnd 6: Ch 1, * hdc in each of the next 4 sts, 2 hdc’s in next st, rep from * around, join with a sl st in top of first hdc – 60 sts. Rnd 7: Ch 1, * 2 hdc’s in next st, hdc in each of the next 4 sts, popcorn in next st, rep from * around, join with a sl st in top of first hdc – 70 sts. Rnd 8: Ch 1, * hdc in each of the next 6 sts, 2 hdc’s in next st, rep from * around, join with a sl st in top of first hdc – 80 sts. Rnd 9: Ch 1, * 2 hdc’s in next st, hdc in each of the next 6 sts, popcorn in next st, rep from * around, join with a sl st in top of first hdc – 90 sts. Rnd 10: Ch 1, hdc in each st around, join with a sl st in top of first hdc. Rnd 11: Ch 1, * hdc in each of the next 8 sts, popcorn in next st, rep from * around, join with a sl st in top of first hdc. Rnd 12: Rep Rnd 10. Rnd 13: Ch 1, hdc in each of the next 7 sts, popcorn in next st, * hdc in each of the next 8 sts, popcorn in next st, rep from * around, end hdc in last st, join with a sl st in top of first hdc. Rnd 14: Rep Rnd 10. Rnd 15: Ch 1, hdc in each of the next 6 sts, popcorn in next st, * hdc in each of the next 8 sts, popcorn in next st, rep from * around, end hdc in each of the last 2 sts, join with a sl st in top of first hdc. Rnd 16: Rep Rnd 10. Work 6 more rnds in this manner – on odd numbered rnds, work 1 less hdc at beg of rnd and 1 more hdc at end of rnd. On even numbered rnds, rep Rnd 10. Do not break off yarn. First Earflap: Row 1 (RS): Ch 1, hdc in each of the next 18 sts. Turn. Working back and forth, rep this row 5 times more, end on WS. Row 7 (RS): Ch 1, hdc in first st, dec over next 2 sts, hdc in each st to last 3 sts, dec over next 2 sts, hdc in last st – 16 sts. Turn. Rep this row 6 times more – 4 sts. Turn. Row 14: (Dec over next 2 sts) twice – 2 sts. Turn. Row 15: Dec over next 2 sts – 1 st. Fasten off. Second Earflap: With RS facing, skip 18 sts on last rnd of hat. Using crochet hook, join yarn in next st [...]



BESEME

2010-11-18T12:41:03.953+02:00

One size FINISHED MEASUREMENTS Approximately 10” wide (at widest point) x 66” long to end of longest loop MATERIALS 3 Hanks berroco sundae (100 grs), #8725 Bramble Crochet hook, size 10.00 mm (NP-15) OR SIZE TO OBTAIN GAUGE GAUGE 9 dc’s = 4½” SCARF Row 1: With crochet hook, ch 25. Sl st in back loop of 12th ch from hook, then in back loop of each ch to end. Ch 141, turn. Row 2: Sl st in back loop of 12th ch from hook, then in back loop of each of the following 13 ch’s; ch 2 (counts as 1 dc), dc in each of the next 8 ch’s; * ch 9, skip 9 ch’s, dc in each of the next 9 ch’s, * rep between *’s 5 times. Turn. Row 3: Sl st in first st. Ch 24, sl st in back loop of 12th ch from hook, then in back loop of each of the next 12 ch’s; sl st in next st, ch 4 (counts as 1 dc and ch 1), skip 1 dc, dc in next dc, * ch 1, skip 1 dc, dc in next dc, * rep between *’s twice more, ** ch 9, skip 9 ch’s, dc in next dc, rep between *’s 4 times **; rep between **’s 5 times more. Ch 24, turn. Row 4: Sl st in back loop of 12th ch from hook and in back loop of each of the next 12 ch’s; sl st in next st, ch 4 (counts as 1 dc and ch 1), dc in next dc, * ch 1, dc in next dc *, rep between *’s twice more; ** ch 9, skip 9 ch’s, dc in next sc, rep between *’s 4 times more **; rep between **’s 5 times more. Ch 24, turn. Row 5: Sl st in back loop of 12th ch from hook and in back loop of each of the next 12 ch’s; sl st in next st, ch 3, sc in next dc, ch 4, skip 1 dc, sc in next dc, ch 3, sl st in next dc; * ch 10, skip 9 ch’s, sl st in next dc; ch 3, sl st in next dc; ch 3, sc in next dc, ch 4, sc in next dc, ch 3, sl st in next dc *; rep between *’s 5 times more; ch 10, skip 4 ch’s, sl st in next dc, ch 3, sc in next dc, ch 4, skip 1 dc, sc in next dc, ch 3, sl st in 3rd ch of beg ch-4. Ch 24, turn. Row 6: Sl st in back loop of 12th ch from hook and in back loop of each of the next 12 ch’s; * 3 sc’s, in ch-3 loop; (sc, ch 10, sc, ch 16, sc, ch 10, sc) all in ch-4 loop; 3 sc’s in ch-3 loop; (4sc’s, ch 2, 4 sc’s) all in ch-10 loop, rep from * 5 times more, 3 sc’s in ch-3 loop; (4 sc’s, ch 2, 4 sc’s) all in ch-4 loop; 3 sc’s in ch-3 loop, fasten off. Note: For Rnd 7, you will be working around all 4 edges of scarf. Rnd 7: Turn scarf so that straight edge is at the top. With RS facing, using crochet hook, join yarn with a sl st in bottom loop of first ch. Sc in this ch and in each of the next 8 ch’s, (you will be working over dc’s of Row 2); * ch 4, sc in center of ch-9 space, ch 4, sc in each of the next 9 ch’s, rep from * 5 times more. Turn so that you are working along side edge of scarf. ** Ch 3 in front of strand of fringe, sc in next ch space (between 2 strands of fringe), ch 25, sc in same ch space **, rep between **’s once more, ch 3, sl st in corner st of scarf edge. Turn so that you are working along bottom edge of scarf. *** Ch 3, skip 2 sc’s, sc in next sc, ch 5, sc in middle of ch-10 loop, ch 5, sc between loops, ch 8, sc in middle of ch-16 loop, ch 8, sc between loops, ch 5, sc in middle of ch-10 loop, ch 5, sc at base of same ch-10 loop, ch 3, skip 2 sc’s, sc in next sc, ch 4, sc in ch-2 space, ch 8, sc in same ch-2 space, ch 4, sc in next sc, rep from *** 5 times more, ch 3, skip 2 sc’s, sc in next sc, ch 5, sc in middle of next ch-10 loop, ch 5, sc between loops, ch 8, sc in middle of ch-16 loop, ch 8, sc between loop, ch 5, sc in middle of ch-10 loop, ch 5, sc in base of [...]



Wınter floral 1

2010-10-08T18:06:09.097+03:00

One size FINISHED MEASUREMENTS Approximately 10½” wide x 26” long Note: Piece is double thickness and is worked sideways around neck MATERIALS 2 Hanks each BERROCO ULTRA ALPACA LIGHT (50 grs), #4216 Viola (A) and #4217 Tupelo (B) and 1 hank #4212 Cordoba Grape (C) 16” Length circular knitting needle, size 5 (3.75 mm) OR SIZE TO OBTAIN GAUGE Straight knitting needles, size 5 (3.75 mm) 2 St markers (2 different colors) Three 1” buttons GAUGE 23 sts = 4”; 32 rows = 4” in St st TO SAVE TIME, TAKE TIME TO CHECK GAUGE COWL With circular needle, using A, cast on 126 sts. Join, being careful not to twist sts. Mark for beg of rnd and carry marker up. Join B. Work in St st (knit EVERY rnd). Rnd 1: Work Rnd 1 of Chart 1 over 63 sts, place marker, work Row 1 of Chart 2 over 63 sts. Work even in pat as established until piece measures 21” from beg. Drop B and knit 1 rnd with A. Change to C. Next Row: Hold ends of circular needle parallel with 63 sts on front end of needle and 63 sts on back end. Using straight needle, * k1 st from front of needle and 1 st from back of needle tog; rep from * across – 63 sts remain. Buttonband: Ribbing: Row 1 (WS): P3, * k3, p3, rep from * across. Row 2 (RS): K3, * p3, k3, rep from * across. Rep these 2 rows until band measures 2 ½”, end on WS. Bind off in ribbing. Buttonhole Band: Fold cast-on edge of cowl in half with 63 sts in front and 63 sts in back. With RS facing, using straight needles and C, pick up and k63 sts across cast-on, working through double thickness of cowl. Work in ribbing same as buttonband for 1¼”, end on WS. Buttonhole Row (RS): Work 5 sts, bind off 4 sts, (work 8 sts, bind off 4 sts) twice, work to end. Next Row: Work in ribbing as established, cast on 4 sts over each group of sts bound off on previous row. Complete same as buttonband. Sew on buttons. [...]



SOFO

2010-09-09T14:26:28.175+03:00

(image)
(image)

One size

FINISHED MEASUREMENTS
Approximately 46” across x 32” long (including border)

MATERIALS
2 Balls berroco remix (100 grs), #3927 Old Jeans (A) and 1 ball each #3901 Birch (B), #3949 Nightfall (C) and #3924 Clementine (D)
29” Length circular knitting needle, size 8 (5.00 mm) OR SIZE TO OBTAIN GAUGE

GAUGE
17 sts = 4”; 21 rows = 4” in Dice Check
17 sts = 4”; 23 rows = 4” in St st
TO SAVE TIME, TAKE TIME TO CHECK GAUGE

DICE CHECK (Multiple of 4 sts)

Row 1 (WS): With A, purl.

Row 2: With B, k1, sl 2 WYIB, * k2, sl 2 WYIB, rep from * to last 5 sts, end k2, sl 2 WYIB, k1.

Row 3: With B, p1, sl 2 WYIF, * p2, sl 2 WYIF, rep from * to last 5 sts, end p2, sl 2 WYIF, p1.

Row 4: With A, knit.

Row 5: With C, p3, * sl 2 WYIF, p2, rep from * to last st, end p1.

Row 6: With C, k3, * sl 2 WYIB, k2, rep from * to last st, end k1.

Rep these 6 rows for Dice Check.

BLANKET

With circular needle, using A, cast on 184 sts. Work even in Dice Check until piece measures 29“ from beg, end on WS with Row 6. Bind off.

FINISHING

With RS facing, using circular needle and D, pick up and k184 sts along cast-on edge of Blanket. Work even in Garter St for 1½”, end on WS. Bind off. Repeat along bound-off edge of blanket. With RS facing, using circular needle and D, beg at outer edge of one border, pick up and k136 sts along one side edge of Blanket to outer edge of the other border. Work even in Garter St for 1½”, end on WS. Bind off. Repeat along the other side edge of blanket.




OUTRE

2010-08-06T15:20:49.323+03:00

(image)
(image)



ANNE VE BEBEK YUNUS:)MOTHER AND BABY DOLPHIN:)

2010-06-14T13:42:22.656+03:00

(image)
Fimo çalışması / Fimo craft work



Embrace

2010-04-23T15:52:41.877+03:00

SIZESDirections are for women’s size X-Small/Small. Changes for sizes Medium/Large and 1X/2X are in parentheses.FINISHED MEASUREMENTSBust (closed) – 36(44-52)”Length – 15(17-19)”Note: Since this shrug is a wrap, bust measurement given is the bust measurement that the sweater will fit, not the actual measurement of sweater. Depending on how sweater is wrapped, each size will fit multiple sizes.MATERIALS5(7-9) Hanks Berroco seduc (40 grs), #4460 Kitten GrayStraight knitting needles, size 7 (4.50 mm) OR SIZE TO OBTAIN GAUGECable needle (cn)GAUGE20 sts = 4”; 28 rows = 4” in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGEBACKWith straight needles, cast on 63(83-103) sts. Work even in St st until piece measures 1” from beg, end on WS.Inc Row (RS): K1, M1k, k to last st, M1k, k1 – 65(85-105) sts. Rep this inc every 1(1-1¼-1¼-1½-1½)” 4 times more – 73(93-113) sts. Work even until piece measures 5(6-7)” from beg, end on WS. Mark beg and end of last row. Rep Inc Row every 4th row 8(1-0) time, every 6th row 3(10-5) times then every 8th row 0(0-6) times – 95(115-135) sts. Work even if necessary until piece measures 7(9-11)” above markers, end on WS. Rep Inc Row on next row, then every RS row 13 times more – 123(143-163) sts. Work even until piece measures 16(18-20)” from beg, end on WS. Bind off 5(7-9) sts at beg of the next 10 rows. Bind off remaining 73 sts.LEFT FRONTTie: With straight needles, cast on 18 sts. Keeping 2 sts each side in Garter St and remaining sts in St st, work even until piece measures 35” from beg, end on WS. Mark beg and end of last row for beg of front.Front: Inc Row (RS): K to last 4 sts, M1k, k4 – 19 sts. Continuing to keep 2 sts at each side in Garter St and remaining sts in St st, rep Inc Row every RS row 15(38-61) times more, then every 4th row 22(14-6) times – 56(71-86) sts. Work even until piece measures 19(21-23)” above markers, end on WS.Pleating Row (RS): K30(45-55), sl 3 sts to cn and hold in FRONT, (k first st on cn and first st on LH needle tog) 3 times; sl 3 sts to cn and hold in BACK, (k first st on LH needle and first st on cn tog) 3 times, k to end – 50(65-80) sts.Next Row (WS): Bind off 20(30-40) sts, p to end – 30(35-40) sts. Bind off 3 sts at beg of the next WS row, then 2 sts at beg of the following WS row. Bind off remaining 25(30-35) sts.RIGHT FRONTWork to correspond to left front, reversing all shaping. Work incs 4 sts in from beg of RS rows. Work pleating 14(14-19) sts in from beg of RS row. Work bind-offs at beg of RS rows.FINISHINGFollowing schematic, match edges A, B, C and D on back with corresponding edges on front and sew these edges tog.[...]



YOYO TOTE

2010-04-11T17:46:05.325+03:00

FINISHED MEASUREMENTSApproximately 12½ wide x 8” high x 5” deep (Not including handles)MATERIALS3 Hanks berrocco weekend(100 grs), #5946 PhloxStraight knitting needles, size 7 (4.50 mm) OR SIZE TO OBTAIN GAUGE1 Set (4) double pointed knitting needles (dpn), size 6 (4.00 mm)1 St markerTapestry needle1 Pair 12” sewn round rein handles #RR12 from Homestead HeirloomsOne 8” dowel and finial set from Homestead HeirloomsGAUGE18 sts = 4”; 26 rows = 4” in St st on larger needlesTO SAVE TIME, TAKE TIME TO CHECK GAUGENOTELining and outer sections of bag are worked all in one piece, starting and ending at center bottom seam of lining.OPEN CIRCLERow 1 (RS): K to marker, join another hank of yarn and bind off center 9 sts, k to end. Working both sides at once, bind off 3 sts at each circle edge 3 times. Work 3 rows even. Cast on 3 sts at each circle edge 3 times, end on RS.Next Row (WS): Purl, cast on 9 sts over sts bound off on Row 1.BAGFront Lining: With straight needles, cast on 57 sts. Work even in St st for 2½”, end on WS. Purl 2 rows (Garter ridge). Cast on 11 sts at beg of the next 2 rows – 79 sts. Work even in St st for 2 rows.* Dec Row (RS): K1, k2 tog, k to last 3 sts, SSK, k1 – 77 sts. Purl 1 row, knit 1 row, purl 1 row. Rep Dec Row once more. Purl 1 row. * Rep between *’s twice more, end on WS – 67 sts. Rep Dec Row every RS row 5 times more 57 sts. Work even until piece measures 9½” from beg, end on WS. Purl 2 rows (Garter Ridge – this is the top edge of bag and end of front lining).Front: Work even until piece measures 10½” from beg, end on WS. Mark beg and end of last row. Work even until piece measures 11½” from beg, end on WS. Purl 2 rows (Garter Ridge). Work even in St st until piece measures 2” above markers, end on WS.Note: Please read through this entire section before starting to knit.Inc Row (RS): K1, M1k, k to last st, M1k, k1 – 59 sts. Rep this inc every RS row 4 times more, end on WS – 67 sts. ** Work dec row, purl 1 row. Work dec row, purl 1 row, knit 1 row, purl 1 row ** - 71 sts. Rep from ** twice more – 79 sts. AT THE SAME TIME, when piece measures 4” above markers, end on WS. Mark center 9 sts. Continuing to work incs as before, work Open Circle. When Open Circle and all incs have been completed, work even on 79 sts until piece measures 8” above markers, end on WS. Bind off 11 sts at beg of the next 2 rows – 57 sts. Work even until piece measures 2½” above bound-off sts, end on WS. Mark beg and end of last row – this is the center bottom of bag.Back: Work same as front, working lining at end and omitting Open Circle. When lining measures 13½” above markers, end on WS – 57 sts.Next Row (RS): K4, bind off 49 sts, k to end.Following Row: P4, cast on 49 sts, p to end. Complete same as front and front lining. Bind off.FINISHINGYo Yo: With RS facing, using dpn’s, beg at lower edge of Open Circle, pick up and k96 sts around entire edge of Open Circle. Mark for beg of rnd and carry marker up. Purl 1 rnd.Rnd 2: * Yo, p2 tog, rep from * around. Rep this rnd until yo yo measures 3” from beg.Dec Rnd: * P2 tog, rep from * around – 48 sts. Bind off purlwise. Break off yarn leaving an 8” long end. Thread end into tapestry needle and thread end through every other st of bind-off. Pull up tightly and secure. Fold lining to inside along Garter Ridges at top edges of bag. Sew cast-on and bound-off edges of lining together. Sew side seams of [...]



RED AND GREEN NORDIC SWETER

2010-04-01T10:00:04.977+03:00

2 RED AND GREEN NORDIC PULLOVERSkill level: IntermediateSIZEApproximately 4” across (cuff to cuff) x 2½” highMATERIALS1 Ball each BERROCO COMFORT DK (50 grs), #2762 Spruce (A) and #2751 True Red (B)Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)GAUGE22 sts = 4”; 32 rows = 4” in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGENOTEBody of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are picked up and worked down to cuffs.BODYWith straight needles, using A, cast on 16 sts. Knit 1 row on WS. Join B and work in St st, following Chart 1 until 13 rows have been completed, end on RS. With A, purl 1 row.Shape Neck: Next Row (RS): With A, k5, bind off center 6 sts, k to end.Following Row: With A, p5, cast on 6 sts, p to end – 16 sts. Knit 1 row. Beg with Row 13, follow Chart 1 until Row 1 has been completed, end on WS. With A, purl 1 row on RS. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.SLEEVESWith RS facing, using straight needles and A, pick up and k12 sts between armhole markers. Purl 1 row. Join B and work in St st following Chart 2 until Row 4 has been completed, end on WS. With A, purl 1 row on RS. Bind off.FINISHINGFold sweater in half and sew side and sleeve seams.Neck Edging: With RS facing, using crochet hook and A, work in sc around entire neck edge. Join with a sl st in first sc. Fasten off. Cut two 6” long strands of B. Draw strands through front of sweater just below neck and tie as in photo, trimming ends.[...]



GREEN SMOCKED YOKE PULLOVER

2010-03-20T10:00:04.036+02:00

11 GREEN SMOCKED YOKE PULLOVERSkill level: EasySIZEApproximately 3¾” across (cuff to cuff) x 2½” highMATERIALS1 Ball BERROCO COMFORT DK (50 grs), #2761 LovageStraight knitting needles, sizes 4 (3.50 mm) and 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)Tapestry needleGAUGE22 sts = 4”; 32 rows = 4” in St st on larger needlesTO SAVE TIME, TAKE TIME TO CHECK GAUGENOTEBody of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are picked up and worked down to cuffs.BODYWith smaller needles, cast on 17 sts.Ribbing: Row 1 (RS): k1, * p1, k1, rep from * across.Row 2: P1, * k1, p1, rep from * across. Change to larger needles and work even in St st until piece measures 1½” from beg, end on WS, dec 1 st at end of last row – 16 sts. Mark beg and end of last row for beg of armholes. Change to smaller needles.Row 1 (RS): * K1TBL, p2, rep from * across, end k1TBL.Row 2: * P1TBL, k2, rep from * across, end p1TBL. Rep these 2 rows twice more, end on WS.Shape Neck: Next Row (RS): Work 5 sts, bind off center 6 sts, work to end.Following Row: Work 5 sts, cast on 6 sts, work to end – 16 sts. Rep rows 1 and 2 three times more, end on WS, inc 1 st at end of last row – 17 sts. Mark beg and end of last row for end of armholes. Change to larger needles and work even in St st until piece measures same as front to top of ribbing. Change to smaller needles and work 2 rows of Ribbing. Bind off in ribbing.SLEEVESWith RS facing, using larger needles, pick up and k11 sts between armhole markers. Beg with a p row, work even in St st for 5 rows, end on WS. Change to smaller needles and work in Ribbing for 2 rows. Bind off in ribbing.FINISHINGSmocking: Cut one 10” long strand of yarn. Thread strand into tapestry needle. Wrap yarn around 2 center ribs on center front and back, gathering ribs tog as in photo and tie strand tog on WS. Repeat with 2 ribs on each shoulder. Repeat with 2 center ribs at bottom of yoke on back. Cut one 12” long strand and thread into tapestry needle. Insert needle from RS to WS in center front just below yoke. Wrap yarn around 2 ribs at each side of center rib, gathering ribs tog, then bring yarn back from WS to RS at starting point. Tie as in photo. Trim ends.Neck Edging: With RS facing, using crochet hook, work in sc around entire neck edge. Join with a sl st in first sc. Fasten off. [...]



DIAMOND FAIRISLE PULLOVER

2010-03-10T10:00:05.812+02:00

0 DIAMOND FAIRISLE PULLOVERSkill level: IntermediateSIZEApproximately 4½” wide (cuff to cuff) x 2¼” highMATERIALS1 Ball each BERROCO COMFORT DK (50 grs), #2761 Lovage (A), #2703 Barley (B), #2760 Beet Root (C), #2721 Sprig (D) and #2762 Spruce (E)Straight knitting needles, size 6 (4.00 mm) OR SIZE TO OBTAIN GAUGECrochet hook, size 3.75 mm (F-5)GAUGE22 sts = 4”; 32 rows = 4” in st stTO SAVE TIME, TAKE TIME TO CHECK GAUGENOTEThe body of this sweater is worked in one piece from lower front edge to lower back edge. Sleeves are then picked up and worked down to cuffs.BODYWith straight needles, using A, cast on 17 sts. Knit 1 row on WS. Work even in St st following Chart 1 until Row 14 has been completed, end on WS.Shape Neck: Next Row (RS): With B, k5, bind off center 7 sts, k to end.Following Row: With B, p5, cast on 6 sts, p to end – 17 sts. Beg with Row 14, follow Chart 1 backwards to Row 1, end on WS. With A, purl 1 row on RS. Bind off. Measure down 1” from neck on each side of back and front and mark for armholes.SLEEVESWith RS facing, using straight needles and C, pick up and k11 sts between armhole markers. Purl 1 row. Follow chart 2 for 6 rows, end on WS. With A, purl 1 row on RS. Bind off.FINISHINGFold sweater in half and sew side and sleeve seams.Neck Edging: With RS facing, using crochet hook and B, work in sc around entire neck. Join with a sl st in first sc. Fasten off.[...]