Subscribe: DelDOT -- Road Closures and Restrictions
http://deldot.net/syndication.ejs?cat=STR
Added By: Feedage Forager Feedage Grade B rated
Language: English
Tags:
bridge  closure  closures  construction  february  intermittent lane  lane closures  lane  northbound  road  route  southbound 
Rate this Feed
Rate this feedRate this feedRate this feedRate this feedRate this feed
Rate this feed 1 starRate this feed 2 starRate this feed 3 starRate this feed 4 starRate this feed 5 star

Comments (0)

Feed Details and Statistics Feed Statistics
Preview: DelDOT -- Road Closures and Restrictions

DelDOT -- Road Closures and Restrictions



Anticipated lane restrictions / road closures.



Copyright: Copyright 2002 - 2017 Delaware Department of Transportation, All Rights Reserved
 



5th Street/Route 9 (Bridge) between New Castle Avenue and Clinton Street (Delaware City) (U.S. Army Corps of Engineers)

Fri, 07 Apr 2017 04:00:00 GMT

09/12/2016 to 04/07/2017 Closure of bridge for reconstruction beginning on Monday, September 12 until late April.

Detour: Wrangle Hill Road to U.S. Route 13 to Pole Bridge Road.



Bear Corbitt Road between DuPont Parkway and north of Pigeon Run Road (T201606101-North I)

Fri, 31 Mar 2017 04:00:00 GMT

01/17/2017 to 03/31/2017 Daytime lane or shoulder closure for concrete repairs and the installation of islands at the intersections of Garwood Drive/Country Woods Drive, and Regal Boulevard.

Milling and paving will occur in spring 2017.



Denny Road crossover between SR 896 northbound/southbound (T200504110-Group 1)

Fri, 12 May 2017 04:00:00 GMT

12/14/2016 to 05/12/2017 Closure of crossover at 7:30 p.m. on Wednesday, December 14. Detour routes will be posted for motorists.



Dennys Road and Howell School Road, SR 896 to SR 71 (T200504110-Group I)

Fri, 29 Dec 2017 05:00:00 GMT

03/07/2016 to 12/29/2017 Weekdays from 9 a.m. until 3 p.m. Lane and shoulder closures on Dennys Road and Howell School Road near SR 896 for the installation of drainage and erosion control measures.

Construction of highway safety improvement project.



Exit 5B/I-95 northbound to SR 141 northbound between Ramp off of I-295 onto SR 141 northbound (T201109002-Group I)

Fri, 30 Jun 2017 04:00:00 GMT

06/24/2016 to 06/30/2017 Exit will be closed on Friday, June 24 until late-June 2017 for the demolition of the bridge and reconstructing of a new bridge.

SR 141 northbound at intersection of Airport Road - NO LEFT TURNS.



Fourth Street (Bridge over the Christina River) between North Church Street and Christiana Avenue (Bridge Management Section)

Thu, 23 Feb 2017 05:00:00 GMT

02/22/2017 to 02/23/2017 Wednesday, February 22 from 9 a.m. until 3 p.m. Alternating right lane closures on Fourth Street in the northbound and southbound directions, between North Church Street and Christiana Avenue.

Thursday, February 23 from 9 a.m. until 3 p.m. Multiple bridge openings throughout the day to complete inspections in areas only accessible while the bridge is open. Motorists and pedestrians should expect delays when traveling in this area. Fourth Street will remain open with no restrictions between the bridge openings. Vehicular and Pedestrian traffic will be allowed to clear prior to beginning a new bridge opening.



Howell School Road between SR 896/Summit Bridge Road and the Entrance to Lums Pond State Park(T200504110-Group 1-Canal)

Sat, 01 Apr 2017 04:00:00 GMT

01/31/2017 to 04/01/2017 Weekdays from 9 a.m. until 3 p.m.

Daytime lane closures for utility work on Howell School Road



I-495 northbound at U.S Route 13, south of Wilmington AND I-495 southbound at Exit 1/U.S. Route 13 off-ramp (T201607701-Chapman)

Fri, 03 Mar 2017 05:00:00 GMT

08/12/2016 to 03/03/2017 Right and cetner lanes shift for bridge maintenance.

Traffic shift on ramp (24/7) for bridge maintenance.



I-495 northbound at U.S. Route 13 AND Closure of Exit 1/U.S. Route 13 (T201607701-Chapman)

Wed, 22 Feb 2017 05:00:00 GMT

02/18/2017 to 02/22/2017 7 p.m. on Sunday, February 19 until 5 a.m. on Monday, February 20; and 7 p.m. on Monday, February 20 until 5 a.m. on Tuesday, February 21. I-495 lane closures for restriping. Also, closure on I-495 northbound of Exit 1/U.S. Route 13. Detour signage will be posted.

Closure of Exit 1/U.S. Route 13 on I-495 southbound for bridge work from 2 a.m. until 5 a.m. on Tuesday, February 21.



I-495 northbound/southbound between U.S. Route 13 and PA state line (Group 2 Construction-T201407004)

Fri, 09 Jun 2017 04:00:00 GMT

01/16/2017 to 06/09/2017 Monday, February 20 and Tuesday, February 21 from 7 a.m. until 5 p.m. I-95 northbound right shoulder closed at mile marker 13.0 between Exit 6 and I-95/I-495 merge for pedestal crew installing anchor bolts, striping forms from pedestal and anchor bolts.

Wednesday, February 22 from 7 a.m. until 5 p.m. I-95 northbound right shoulder closed at mile marker 13.4 between Exit 6 and I-95/I-495 merge for pedestal crew installing anchor bolts.

Thursday, February 23 from 7 a.m. until 5 p.m. I-95 northbound right shoulder closed at mile marker 13.4 between Exit 6 and I-95/I-495 merge for pedestal crew striping forms from pedestal & anchor bolts.



I-495 southbound at Exit 3/12th Street Ramp (T201400701-Chapman)

Fri, 24 Feb 2017 05:00:00 GMT

01/26/2017 to 02/24/2017 Traffic shift on ramp (24/7) for bridge maintenance.



I-95 Newark Toll Plaza (Tolls)

Fri, 31 Mar 2017 04:00:00 GMT

01/03/2017 to 03/31/2017 Closure of two cash lanes on I-95 southbound at Newark Toll Plaza for the demolition and construction of tunnel stairs.



I-95 northbound/southbound from the Pennsylvania State Line to Brandywine River Bridge (T201709001-Chapman)

Fri, 19 May 2017 04:00:00 GMT

02/15/2017 to 05/19/2017 Right lane closures from 9 a.m. until 3 p.m. and shoulder closures from 8 a.m. until 4 p.m. for tree clearing in the state's right-of-way.



Interstate and District Wide Road System (North Maintenance)

Sun, 31 Dec 2017 05:00:00 GMT

01/01/2017 to 12/31/2017 Monday through Friday from 9 a.m. until 3 p.m. Intermittent lane closures and ramp lane shifts may occur for sweeping operations, pothole repairs, guardrail repairs, bridge inspections, and general maintenance of roadways.



Jamison Corner Road between SR 896/Boyds Corner Road and Hyetts Corner Road (T200911308-Canal)

Fri, 31 Mar 2017 04:00:00 GMT

04/04/2016 to 03/31/2017 The road is closed for the construction of a new bridge.

Detour Route: Boyds Corner Road to U.S. Route 13 to Hyetts Corner Road.

Detour routes will be posted for motorists.



Middleneck Road between Delaware/Maryland state line and U.S. Route 301 (U.S. Route 301 Project)

Fri, 31 Mar 2017 04:00:00 GMT

07/13/2016 to 03/31/2017 Road closure for relocation. Detour routes will be posted for motorists.



Milltown Road from SR 2/Kirkwood Highway to SR 41/Newport Gap Pike (T201606106-Canal)

Fri, 17 Mar 2017 04:00:00 GMT

06/13/2016 to 03/17/2017 Construction on hold until spring, due to lower temperatures.



Myrtle Avenue from Philadelphia Pike west to I-495 Overpass; and I-495 Overpass east to Claymont Train Station (Claymont) (T201201101.01 North)

Mon, 31 Jul 2017 04:00:00 GMT

02/20/2017 to 07/31/2017 Work Hours 7 a.m. until 5 p.m., Monday through Friday, pending weather.

Intermittent lane closures will occur from 8:30 a.m. until 4:30 p.m.



Naamans Road from Foulk Road to U.S. Route 13/Philadelphia Pike (T201606104-Canal)

Fri, 07 Apr 2017 04:00:00 GMT

06/13/2016 to 04/07/2017 Intermittent lane closures and shoulder closures from 8 a.m. until 4 p.m. for milling, paving, and ADA upgrades. (Milling and paving suspended until Spring 2017)



Old Capitol Trail (Bridge over Red Clay Creek) between Newport Gap Pike and Greenbank Road/Stanton Road (T201407801-Group I)

Fri, 03 Mar 2017 05:00:00 GMT

06/27/2016 to 03/03/2017 Bridge painting will require shoulder closures from 9 a.m. until 3 p.m., Monday through Friday.



Old Capitol Trail (Bridge over Red Clay Creek) between Stanton Road and Newport Road (Bridge Management Section)

Thu, 02 Mar 2017 05:00:00 GMT

03/01/2017 to 03/02/2017 Right lane and shoulder closure from 9 a.m. until 2 p.m. for bridge inspection.

Rain date of Thursday, March 2 from 9 a.m. until 2 p.m.



Rockland Road and Ronald McDonald House Intersection (Traffic Signal Construction)

Tue, 28 Feb 2017 05:00:00 GMT

01/11/2017 to 02/28/2017 Monday through Friday from 9 a.m. until 3 p.m. pending weather, new traffic signals & pedestrian indications will be installed. Intermittent lane closures will occur with minor traffic delays at the intersection.

Flaggers will be on-site to direct motorists.



SR 1 northbound/southbound bridge at Route 72/Wrangle Hill Road between U.S. Route 13 and Red Lion Road (Bridge Management Section)

Fri, 03 Mar 2017 05:00:00 GMT

03/02/2017 to 03/03/2017 Daytime shoulder closures from 9 a.m. until 1 p.m. to inspect the bridge substructure on SR 1 northbound/southbound with a bucket truck.



SR 141 and I-95 Interchange Ramps G & F Improvements (T201109002-Group I)

Fri, 29 Dec 2017 05:00:00 GMT

03/10/2016 to 12/29/2017 Nighttime temporary lane shifts on I-95 northbound from 8 p.m. on Wednesday, February 15 until 5 a.m. on Thursday, February 16.

Nighttime temporary lane shifts on I-295 northbound from 8 p.m. on Thursday, February 16 until 5 a.m. on Friday, February 17. Lane shifts are necessary for bridge deck construction.

Weekdays from 9 a.m. until 3 p.m. SR 141 southbound lanes will be reduced to one lane in the construction area.

SR 141 northbound lanes will be reduced to one lane in the construction area.

Closure of Exit 5B/I-295 northbound to SR 141 northbound. Motorists will utilized Exit 5A.

Motorists will no longer be able to make a left turn from SR 141 northbound onto Airport Road during the Exit closure.



SR 141/Powder Mill Road and Childrens Drive/Powder Mill Road Intersection (Traffic Signal Construction)

Tue, 28 Feb 2017 05:00:00 GMT

01/11/2017 to 02/28/2017 Monday through Friday from 8 a.m. until 3 p.m. Signal construction.



SR 2 & Kirkwood Plaza (Traffic Signal Construction)

Sat, 29 Apr 2017 04:00:00 GMT

02/06/2017 to 04/29/2017 All work will be performed during the day & night with intermittent lane closures. Monday through Friday Day Times: 8:00 a.m. - 3:00 p.m. Night Times: 8:00 p.m. - 6:00 a.m. This work will consist of installation of pedestrian signals across SR 2, signalize of eastbound SR 2 thru & modify eastbound FRA. Lane closures will be done at night via the hand-off form. All M.O.T. will be provided by the contractor which includes all signage, light towers, barrels, T.M.A.s, arrow boards, flaggers and police when needed.



SR 2/Kirkwood Highway (Bridge over CSX Railroad and Silver Run) (Bridge Management Section)

Fri, 24 Feb 2017 05:00:00 GMT

02/24/2017 to 02/24/2017 Friday, February 24 from 9 am. until 3 p.m. Alternating right lane closures on SR 2/Kirkwood Highway in the eastbound and westbound directions between SR100 and Prospect Road. Access to the left-turn lane for SR 100 southbound from SR 2/Kirkwood Highway westbound will be maintained at all times.



SR 2/Kirkwood Highway and Kirkwood Plaza (Traffic Signal Construction)

Fri, 07 Apr 2017 04:00:00 GMT

02/06/2017 to 04/07/2017 Daytime shoulder closures from 8 a.m. until 3 p.m. Nighttime lane and shoulder closures from 8 p.m. until 6 a.m. for the installation of pedestrian signals.



SR 273 eastbound/westbound between Chapman Road and Harmony Road (T201607702-Chapman)

Fri, 03 Mar 2017 05:00:00 GMT

01/16/2017 to 03/03/2017 Left lane closure from 8 a.m. until 5 p.m. for bridge maintenance. Left lane shift (24/7).



Silverside Road (Bridge) between Prior Road and Quincy Drive (Bridge Management Section)

Wed, 01 Mar 2017 05:00:00 GMT

02/28/2017 to 03/01/2017 Right shoulder closure from 9 a.m. until 2 p.m. on Tuesday, February 28, to inspect under the bridge on Silverside Road, south of Arden.

Rain date: Wednesday, March 1 from 9 a.m. until 2 p.m.



South College Avenue and West Chestnut Hill Road (T201606101-Group 1)

Mon, 20 Feb 2017 05:00:00 GMT

02/17/2017 to 02/20/2017 Daytime lane closures for ADA improvements.



Strawberry Lane at the U.S. Route 301 intersection between Levels Road and Warwick Road (U.S. Route 301 Project) (T200911303-Canal)

Fri, 29 Dec 2017 05:00:00 GMT

12/19/2016 to 12/29/2017 Strawberry Lane will be closed to traffic at 9 a.m. on Monday, December 19, for the construction of the new Strawberry Lane Bridge over U.S. Route 301.

Traffic accessing the east side of Strawberry Lane will follow Levels Road to Strawberry Lane.

Traffic accessing the west side of Strawberry Lane will follow Warwick Road to Wilson Street/Strawberry Lane.



U.S. Route 301 Mainline Project (T200911303-Canal)

Mon, 08 Apr 2019 04:00:00 GMT

04/08/2016 to 04/08/2019 Monday, February 20 through Thursday, February 23, Continue bridge construction activities along SR 1. Motorists should anticipate single lane closures along northbound or southbound SR 1 between the Roth Bridge and Toll Plaza from 9 a.m. until 3 p.m.

Tuesday, February 21. Motorists should anticipate a single lane closure along southbound SR 1 with periodic traffic drags to move equipment from 10 p.m. until 5 a.m.

Monday, February 20 through Friday, February 24.

Continue dirt hauling and bridge construction activities on Boyds Corner Road. Motorists should anticipate a flagging operation by construction personnel on Boyds Corner Road west of Jamison Corner Road from 8 a.m. until 4 p.m.

Continue dirt hauling and other construction activities on Hyetts Corner Road. Motorists should anticipate lane closures on Hyetts Corner Road between Airmont Drive and Windsor Commons Way with traffic alternating through the work zone utilizing a flagging operation by construction personnel from 7 a.m. until 4 p.m.

Continue dirt hauling and other construction activities across Armstrong Corner Road. Motorists should anticipate a flagging operation by construction personnel on Armstrong Corner Road west of Summit Bridge Road from 7 a.m. until 5 p.m.

Continue dirt hauling and bridge construction activities across Bunker Hill Road. Motorists should anticipate a flagging operation by construction personnel on Bunker Hill Road near Appoquinimink High School from 7 a.m. until 5 p.m.

Middle Neck Road is closed at U.S. Route 301. Motorists wishing to access Middle Neck Road from U.S. Route 301 should follow the posted detour of Bunker Hill Road to Old Telegraph Road and back to Middle Neck Road.

Strawberry Lane is closed to traffic at U.S. Route 301. Motorists wanting to access the east side of Strawberry Lane from U.S. Route 301 will follow Levels Road (SR 15) to Strawberry Lane. Motorists wanting to access the west side of Strawberry Lane from U.S. Route 301 will follow Warwick Road (SR 299) to Wilson Street/Strawberry Lane.



U.S. Route 40 and Church Road/Wellington Drive to Brookmont Road (/Bear)

Sat, 15 Apr 2017 04:00:00 GMT

01/12/2017 to 04/15/2017 Shoulder closures from 9 a.m. until 3 p.m. Monday through Friday for lighting upgrades. All through lane closures will occur at night Monday through Friday from 8 p.m. until 5 a.m., pending weather. Flaggers will be on-site to direct motorists.



West Chestnut Hill Road at Cobberfield Drive (T201606101-Group 1)

Tue, 21 Feb 2017 05:00:00 GMT

02/17/2017 to 02/21/2017 Daytime lane closures for ADA improvements.



Arthursville Road and Everetts Corner Road (Family Dollar Store)

Tue, 28 Feb 2017 05:00:00 GMT

11/30/2016 to 02/28/2017 Intermittent lane closures from 8:30 a.m. until 3 p.m. for hot mix overlay.



Beagle Club Road between Indian Runner Road and Firetower Road

Wed, 22 Feb 2017 05:00:00 GMT

02/20/2017 to 02/22/2017 Road closure for the removal and replacement of crossroad pipe beginning at 7 a.m. on Monday, February 20 until 3 p.m. on Wednesday, February 22, pending weather.

Detour signage is posted for motorists.



Brenford Road between U.S. Route 13 and Hickory Ridge Road (Willow Wood Subdivision)

Thu, 01 Jun 2017 04:00:00 GMT

10/24/2016 to 06/01/2017 Intermittent lane closure from 8 a.m. until 3 p.m. for road widening and entrances for subdivision.



Clapham Road, north of Jury Drive (Little Heaven Grade Separated Intersection Project)

Tue, 28 Feb 2017 05:00:00 GMT

08/29/2016 to 02/28/2017 New Traffic Pattern - 24 Hour Lane Shift for roadbox widening.



Fast Landing Road between East Dennys Road and Front Street (The Landings)

Fri, 30 Jun 2017 04:00:00 GMT

08/29/2016 to 06/30/2017 Intermittent lane closures from 7 a.m. until 5 p.m. for entrance construction.



Kenton Road between West Denneys Road and Maple Dale Road

Fri, 24 Feb 2017 05:00:00 GMT

01/23/2017 to 02/24/2017 Intermittent lane closures from 8:30 a.m. until 3 p.m. for the installation of a gas line.



Martin Luther King Boulevard from Legislative Avenue to U.S. Route 13

Fri, 28 Jul 2017 04:00:00 GMT

03/01/2017 to 07/28/2017 Nighttime lane closures from 6 p.m. until 6 a.m. for ADA curb, sidewalk, and utility adjustments.

Milling and paving to begin after July 4, 2017.



McBry Drive between Highview Avenue and end of roadway (Woods Manor Estates)

Tue, 28 Feb 2017 05:00:00 GMT

10/06/2016 to 02/28/2017 Intermittent lane closure from 7 a.m. until 5 p.m. for paching and overlay.



Mifflin Road from Forrest Avenue to North Street

Tue, 28 Feb 2017 05:00:00 GMT

10/06/2016 to 02/28/2017 Intermittent lane closures from 7 a.m. until 5 p.m. for patching.



New Burton Road and Wyoming Mill Road; North Street and Saulsbury Road; U.S. Route 13 northbound onto Charles Polk Road; AND Charles Polk Road (West Dover Connector Project) (T200411701)

Sat, 01 Jul 2017 04:00:00 GMT

05/13/2015 to 07/01/2017 Daytime lane and shoulder closures from 9 a.m. until 3 p.m.

New traffic pattern for New Burton Road between Front Street and Webbs Lane. New traffic pattern for widening of New Burton Road (southside of New Burton Road). Traffic is shifting from north to south side of the road.

US NB 13: Traffic will be re-shifted back to original alignment.

New traffic pattern for Charles Polk Road: Lane shift was installed for shifting from Charles Polk Road to portion of West Dover Connector mainline then back to John Clark Road.

New traffic pattern for West North Street: Lane shift will begin for completing Phase 2 of Stage 3 work.



New Street between West Water Street and West Loockerman Street (City of Dover-Public Works)

Fri, 17 Mar 2017 04:00:00 GMT

12/12/2016 to 03/17/2017 Portions of the roadway will be closed beginning at 7 a.m. on Monday, December 12 for water main replacement.



North State Street from Walker Road to U.S. Route 13

Thu, 01 Jun 2017 04:00:00 GMT

03/01/2017 to 06/01/2017 Nighttime lane closures from 6 p.m. until 6 a.m. for milling and paving, intersection signal work, ADA curb, sidewalk and utility adjustment.



Peachtree Run between Irish Hill Road and Millchop Lane (Chestnut Ridge)

Fri, 30 Jun 2017 04:00:00 GMT

10/27/2016 to 06/30/2017 Intermittent lane closure 7 a.m. until 5 p.m. for the installation of entrance.



Peachtree Run between Lochmeath Way and Longacre Drive (Johnny Janosik)

Tue, 28 Feb 2017 05:00:00 GMT

12/12/2016 to 02/28/2017 Intermittent lane closure from 8 a.m. until 6 p.m. for roadway patching.



Route 14/Milford-Harrington Highway between Broad Street and Blair Pond Road (Southfield)

Fri, 30 Jun 2017 04:00:00 GMT

12/01/2016 to 06/30/2017 Intermittent lane closures from 7 a.m. until 5 p.m. for entrance improvements.



SR 1 Northbound, north of Mulberrie Point Road

Tue, 28 Feb 2017 05:00:00 GMT

12/12/2016 to 02/28/2017 24 Hour Lane Shift



SR 1 Northbound/Southbound - Barratts Chapel Road Crossover

Thu, 31 Dec 2099 05:00:00 GMT

10/13/2016 to 12/31/2099 Permanent closure for the SR 1, Little Heaven Grade Separated Intersection. Detour signage is posted for motorists.



SR 1 Southbound, north of Mulberrie Point Road to Skeeter Neck Road

Tue, 28 Feb 2017 05:00:00 GMT

10/28/2016 to 02/28/2017 24 hour lane shift.



SR 1 northbound and southbound (Crossover Closed) (Little Heaven Grade Separated Intersection Project)

Fri, 24 Aug 2018 04:00:00 GMT

01/21/2016 to 08/24/2018 These closures will affect the following movements: Crossover closed at Mulberrie Point Road and SR 1.

On Mulberrie Point Road westbound at SR 1 northbound, this will become a right-turn only (to go north), and on Mulberrie Point Road eastbound at SR 1 southbound, this will also become a right-turn only (to go south).

Left turn lane closed on SR 1 northbound onto Mulberrie Point Road on the west side of SR 1 connecting to Clapham Road.

Left turn lane closed on SR 1 southbound onto Mulberrie Point Road on the east side of SR 1.



SR 1 northbound and southbound from Skeeter Neck Road to North Frederica Interchange

Tue, 28 Feb 2017 05:00:00 GMT

10/13/2016 to 02/28/2017 24 Hour Lane Shift



U.S. Route 13 between West Dennys Road and Rustic Lane

Mon, 27 Feb 2017 05:00:00 GMT

02/09/2017 to 02/27/2017 Single lane closure from 8 p.m. until 6 a.m. for the installation of new overhead cable.



West Denneys Road between McKee Road and Kenton Road

Fri, 17 Mar 2017 04:00:00 GMT

02/20/2017 to 03/17/2017 Intermittent lane closures from 8:30 a.m. until 3 p.m. for the installation of gas line.



West Denneys Road between Pearsons Corner Road and Victory Chapel Road (Central Mennonite Church)

Tue, 28 Feb 2017 05:00:00 GMT

09/12/2016 to 02/28/2017 Intermittent lane closure from 8 a.m. until 3 p.m. for shoulder work.



Wheatleys Pond Road between Underwoods Corner and Hillyard Road (Providence Crossing)

Tue, 28 Feb 2017 05:00:00 GMT

11/30/2016 to 02/28/2017 Intermittent lane closure for hot-mix overlay from 8:30 a.m. until 3 p.m.



Bi-State Boulevard from Woodand/Georgetown Road to ONeals Road

Fri, 31 Mar 2017 04:00:00 GMT

09/06/2016 to 03/31/2017 Construction on hold until spring 2017.



Careys Camp Road between Pear Tree Road and English Road

Fri, 03 Mar 2017 05:00:00 GMT

02/27/2017 to 03/03/2017 Road clsoure at 7 a.m. on Monday, February 27 for the removal and replacement of a crossroad pipe. The roadway is anticipated to be open by 7 p.m. on Firday, March 3, pending weather. Detour signage will be posted for motorists.



Hearns Pond Dam from Hearns Pond Dam Route to Shore Drive

Fri, 30 Jun 2017 04:00:00 GMT

06/13/2016 to 06/30/2017 Closure of Hearns Pond Dam Access Road/Parking Facility/Boat Ramp for the reconstruction of the dam.



Kings Highway and Gills Neck Road Intersection

Fri, 02 Jun 2017 04:00:00 GMT

01/09/2017 to 06/02/2017 Nighttime lane closures with traffic restrictions from 9 a.m. until 2 p.m. AND 4 p.m. until 6 p.m. due to school traffic. Daytime shoulder closures for utility work.



Pilottown Road (Bridge over Canary Creek) Lewes

Thu, 31 Dec 2099 05:00:00 GMT

06/22/2016 to 12/31/2099 Northbound lane closed for repair of roadway approach. Signage will be posted for motorists.



SR 1 between SR 26 and SR 54

Fri, 26 May 2017 04:00:00 GMT

02/06/2017 to 05/26/2017 7 a.m. until 7 p.m., Monday through Friday. Sr 1 median with intermittent SR 1 northbound and southbound left turn lane closures for fiber optic work.

7 a.m. until 7 p.m., Monday through Friday. SR 1 northbound left lane closed as needed based on the conditions of median.



SR 1 northbound/southbound at Layton Drive Intersection (South Bethany)

Tue, 21 Feb 2017 05:00:00 GMT

02/21/2017 to 02/21/2017 Intermittent lane closures from 9 a.m. until 5 p.m. at the intersection for upgrade of signal.



SR 1 southbound between U.S. Route 9/Lewes-Georgetown Highway (Lewes) and SR 1A (Rehoboth) AND SR 1 northbound between SR 1A (Rehoboth) and U.S. Route 9/Lewes-Georgetown Highway (Lewes)

Tue, 21 Feb 2017 05:00:00 GMT

02/14/2017 to 02/21/2017 Rolling lane closures from 6 a.m. until 6 p.m. for crack sealing of pavement. At all times, one lane will remain open to motorists.



Sharptown Road from Hastings Drive to Delaware/Maryland state line

Tue, 28 Mar 2017 04:00:00 GMT

09/05/2016 to 03/28/2017 Intermittent lane closure with flaggers from 7 a.m. until 5 p.m. for curb and sidewalk replacement.



U.S. Route 113 northbound and southbound from Dickerson Road to Town Center Boulevard

Fri, 24 Feb 2017 05:00:00 GMT

02/13/2017 to 02/24/2017 U.S. Route 113 northbound from 9 a.m. until 5 p.m. Left lane closure for sign installation.

U.S. Route 113 southbound from 9 a.m. until 5 p.m. Left shoulder closed for sign installation.



Wooten Road (Bridge over Trussums Pond) between Trussum Pond Road and Gordy Road, southeast of Laurel

Thu, 31 Dec 2099 05:00:00 GMT

10/31/2016 to 12/31/2099 Roadway closed for repair of roadway settlement.