Subscribe: Slideshows by User: prestiva
http://www.slideshare.net/rss/user/prestiva
Preview: Slideshows by User: prestiva

Slideshows by User: prestiva





 






Example - Business, Functional, Technical - Requirements by Murali VenkateshExample - Business, Functional, Technical - Requirements by Murali Venkatesh

Fri, 13 Sep 2013 11:57:16 GMT

(image)
http://www.linkedin.com/in/prestiva/ In product development and process optimization, a requirement is a singular documented physical and functional need that a particular design, product or process must be able to perform. It is most commonly used in a formal sense in systems engineering, software engineering, or enterprise engineering. It is a statement that identifies a necessary attribute, capability, characteristic, or quality of a system for it to have value and utility to a customer, organisation, internal user, or other stakeholder. A specification (often abbreviated as spec) may refer to an explicit set of requirements to be satisfied by a material, design, product, or service. http://www.linkedin.com/in/prestiva/ In product development and process optimization, a requirement is a singular documented physical and functional need that a particular design, product or process must be able to perform. It is most commonly used in a formal sense in systems engineering, software engineering, or enterprise engineering. It is a statement that identifies a necessary attribute, capability, characteristic, or quality of a system for it to have value and utility to a customer, organisation, internal user, or other stakeholder. A specification (often abbreviated as spec) may refer to an explicit set of requirements to be satisfied by a material, design, product, or service.



Example - Project plan by Murali VenkateshExample - Project plan by Murali Venkatesh

Fri, 13 Sep 2013 11:57:14 GMT

(image)
http://www.linkedin.com/in/prestiva/ A project plan, according to the Project Management Body of Knowledge, is: "...a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summarized or detailed."[ • The five process groups are: 1. Initiating 2. Planning 3. Executing 4. Monitoring and Controlling 5. Closing http://www.linkedin.com/in/prestiva/ A project plan, according to the Project Management Body of Knowledge, is: "...a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summarized or detailed."[ • The five process groups are: 1. Initiating 2. Planning 3. Executing 4. Monitoring and Controlling 5. Closing



I gave Management Consulting Training - PPT Outline by Murali VenkateshI gave Management Consulting Training - PPT Outline by Murali Venkatesh

Fri, 13 Sep 2013 11:57:06 GMT

(image)
http://www.linkedin.com/in/prestiva/ http://www.linkedin.com/in/prestiva/



Example: Global Trading Roadmap by Murali VenkateshExample: Global Trading Roadmap by Murali Venkatesh

Fri, 13 Sep 2013 11:56:25 GMT

(image)
http://www.linkedin.com/in/prestiva/ http://www.linkedin.com/in/prestiva/



Example : Maturity model by Murali VenkateshExample : Maturity model by Murali Venkatesh

Fri, 13 Sep 2013 11:56:19 GMT

(image)
http://www.linkedin.com/in/prestiva/ The Capability Maturity Model (CMM)[1] is a development model created after study of data collected from organizations that contracted with the U.S. Department of Defense, who funded the research. This model became the foundation from which Carnegie Mellon created the Software Engineering Institute (SEI). The term "maturity" relates to the degree of formality and optimization of processes, from ad hoc practices, to formally defined steps, to managed result metrics, to active optimization of the processes. http://www.linkedin.com/in/prestiva/ The Capability Maturity Model (CMM)[1] is a development model created after study of data collected from organizations that contracted with the U.S. Department of Defense, who funded the research. This model became the foundation from which Carnegie Mellon created the Software Engineering Institute (SEI). The term "maturity" relates to the degree of formality and optimization of processes, from ad hoc practices, to formally defined steps, to managed result metrics, to active optimization of the processes.



Example: AS-IS Diagram by Murali VenkateshExample: AS-IS Diagram by Murali Venkatesh

Fri, 13 Sep 2013 11:56:12 GMT

(image)
http://www.linkedin.com/in/prestiva/ http://www.linkedin.com/in/prestiva/



Example - Traceability Matrix by Murali VenkateshExample - Traceability Matrix by Murali Venkatesh

Fri, 13 Sep 2013 11:56:12 GMT

(image)
http://www.linkedin.com/in/prestiva/ Traceability matrix is a document, usually in the form of a table, that correlates any two baselined documents that require a many-to-many relationship to determine the completeness of the relationship. It is often used with high-level requirements (these often consist of marketing requirements) and detailed requirements of the product to the matching parts of high-level design, detailed design, test plan, and test cases. http://www.linkedin.com/in/prestiva/ Traceability matrix is a document, usually in the form of a table, that correlates any two baselined documents that require a many-to-many relationship to determine the completeness of the relationship. It is often used with high-level requirements (these often consist of marketing requirements) and detailed requirements of the product to the matching parts of high-level design, detailed design, test plan, and test cases.



Prestiva scoring reconciliationPrestiva scoring reconciliation

Tue, 12 Jul 2011 11:06:12 GMT

(image)
Prestiva scoring reconciliation (allegro,navita,openlink,pci,sungard,triplepoint,ventyx) Prestiva scoring reconciliation (allegro,navita,openlink,pci,sungard,triplepoint,ventyx)






Prestiva PMP process approachPrestiva PMP process approach

Thu, 24 Jun 2010 13:54:02 GMT

(image)
Prestiva PMP process approach Prestiva PMP process approach



Prestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTMPrestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTM

Fri, 11 Jun 2010 10:59:22 GMT

(image)
Oil and Gas : Oil Movement (Scheduling, Nomination, Ticketing) Oil and Gas : Oil Movement (Scheduling, Nomination, Ticketing)



Prestiva - ETRM Practice solutionsPrestiva - ETRM Practice solutions

Fri, 11 Jun 2010 10:39:22 GMT

(image)
Energy Trading and Risk Management solution offering Energy Trading and Risk Management solution offering



Prestiva ETRM process allegroPrestiva ETRM process allegro

Mon, 07 Jun 2010 16:18:38 GMT

(image)
How to create Enterprise Process Model (EPM) using Six Sigma for Energy Trading and Risk Management solution for LNG process using Allegro system. How to create Enterprise Process Model (EPM) using Six Sigma for Energy Trading and Risk Management solution for LNG process using Allegro system.



Prestiva - Open Link Endur Avs ScriptingPrestiva - Open Link Endur Avs Scripting

Thu, 21 Jan 2010 08:50:31 GMT

(image)
OpenLink - Endur - AVS Scripting 101 OpenLink - Endur - AVS Scripting 101



Prestiva Demand Management OverviewPrestiva Demand Management Overview

Thu, 21 Jan 2010 08:47:51 GMT

(image)
Demand Management Overview Demand Management Overview



Prestiva - SAP Advanced Planning And Optimizer OverviewPrestiva - SAP Advanced Planning And Optimizer Overview

Thu, 21 Jan 2010 07:24:49 GMT

(image)
SAP - Advanced Planning And Optimizer Overview SAP - Advanced Planning And Optimizer Overview



Prestiva UpstreamPrestiva Upstream

Fri, 14 Aug 2009 16:43:41 GMT

(image)



101 of Commodity Markets (ETRM)101 of Commodity Markets (ETRM)

Wed, 28 Jan 2009 20:36:53 GMT

(image)
101 of Commodity Market - Energy Trading and Risk Management - Trading - Benefits of commodity futures 101 of Commodity Market - Energy Trading and Risk Management - Trading - Benefits of commodity futures



prestiva_blackhatprestiva_blackhat

Tue, 24 Jul 2007 11:51:34 GMT

(image)
prestiva_blackhat prestiva_blackhat